Visualize spans and traces

Overview​

When you open a trace or a span in Explore spans, the span drilldown provides multiple ways to analyze the same request. Each view highlights a different aspect of the trace so you can move from high-level architecture to precise root cause without losing context.

These views are designed for investigation, not just visualization:

  • Dependencies shows who talks to whom (services or spans) and how the request moves through your architecture.
  • Flame shows where time is spent by highlighting the biggest contributors to end-to-end latency.
  • Gantt shows when things happened by showing the true timing, ordering, and overlap of operations.

The Action bar stays consistent across views, so you can search, filter, and navigate results the same way no matter which perspective you’re using.

How to navigate​

  1. Select a trace or span in Explore spans to open the span drilldown.
  2. The drilldown opens in Gantt view by default. Select Dependencies or Flame from the tab selector to switch perspectives.

How these views speed up investigations​

Together, the Action bar + views enable a fast, repeatable workflow:

  • Find what matters (Search / Highlight errors).
  • Navigate confidently (Next/previous highlights, zoom/pan, maximize).
  • Switch perspectives without losing context (Dependencies ↔ Flame ↔ Gantt).
  • Drill down from architecture → hotspot → exact timing to reach root cause faster.

Time range picker​

The time range picker in the drawer header controls the query window for all data in the drilldown. Use it to widen or narrow the time range beyond what was set on the Explore page — especially useful for very long or large traces.

The picker displays a start and end datetime in the drawer header. Use the left and right arrows to shift the range forward or backward.

Default behavior​

  • The default range is set to the trace's own time boundary (root span start time through the latest span end time). The default times are dynamic, depending on the size of the trace and the number of spans.
  • If the trace spans more than 3 days, the drilldown cannot display the entire trace at once. Use the time range picker to select a 3-day window and navigate through the trace in segments.
  • If the trace contains more than 20,000 spans, the drilldown displays up to 20,000 spans at a time. Use the time range picker to adjust the window and view different groups of spans.

Limitations​

  • Maximum trace time range: 3 days
  • Maximum span display: 20,000 spans per view. This cap applies to Dependencies (Span view and Service view), Flame, and Gantt.

A tooltip on the time range picker indicates whether the current window captures the full trace duration or whether the trace exceeds these limits.

What it affects​

Changing the time range updates all data in the drawer:

  • The Related data tabs re-fetch data within the new range.
  • The span tree itself is reloaded within the new window.
  • Span navigation actions (View Logs, Explore, Service Catalog, View Profiles) use the drawer time range.
  • Export CSV uses the drawer time range.

Indicators​

  • When the selected range covers the full trace duration, the picker shows that the full trace is available. Narrow the range to focus on a specific interval.
  • When the selected range is shorter than the full trace duration, the picker indicates that additional spans may exist outside the current window. Widen the range to view them.

Session behavior​

  • The selected time range persists while navigating between spans within the same drawer session.
  • The time range resets to the default when the drawer is closed and reopened.

Action bar​

The Action bar provides a set of global controls shared across trace views. Use it to keep your investigation focused while switching between Dependencies, Flame, and Gantt.

Action bar

Some controls appear only in certain views (for example, depth in Gantt, rerouting in Flame, grouping in Dependencies).

Note

Some actions available in other drilldown views are not yet available in the Dependencies view. We’re working to bring the same set of header actions to Dependencies in a future update.

Search for any key or value across the trace (for example: service name, operation, span attribute, URL, host, error message).

Use it to

  • Quickly find the span/service you care about in large traces.
  • Reduce noise by focusing attention on a subset of relevant elements.

What to expect

  • When search is active, non-matching elements are visually de-emphasized (dimmed), making matches easier to spot.
  • Use navigation controls to jump between matches.

Show errors​

Highlight spans that contain errors and show the count of error spans.

Use it to

  • Immediately see where failures occur in the trace.
  • Prioritize investigation on spans most likely to explain user impact.

All / Errors filter​

Switch between All spans (default) and Errors only. When Errors is active, the graph re-renders to include only spans that contain errors so you can see failures in architectural context. Pair with Search to drill into a specific failing path.

Move between highlighted results (internal spans, errors, search matches) and keep the graph focused on the current selection.

Use it to

  • Move through matches sequentially instead of scanning the trace manually.
  • Stay oriented in large traces by keeping the current match in view.

Internal spans toggle​

Show or hide internal spans across all views — Gantt, Flame, Dependencies. Use it to

  • Hide internal spans to simplify the view and focus on service-to-service behavior and major boundaries.
  • Show internal spans when you need detailed implementation context inside a service.

Load more spans​

When a trace exceeds the 20,000-span display cap, use Load more spans in the Dependencies view to page through the rest of the trace without widening the time range picker.

When it appears

  • The button appears only when the trace contains more than 20,000 spans, or when the server still has additional spans to return.
  • For traces under 20,000 spans, the button stays hidden — the view already shows every span in the trace.

What happens when you select it

  • Each selection fetches the next 20,000 spans for the current trace and adds them to the view.
  • Once the view contains every span in the trace, the button becomes inactive with the tooltip No more spans to load.

Use it to

  • Inspect long-running or high-fanout traces without narrowing the time range each time.
  • Continue paging through large traces until you see the full span set.

Color by and legend​

Color nodes or spans by a chosen dimension to visually cluster related work and spot patterns. Select the Color by dropdown in the action bar and choose a dimension (on smaller screens, Color by appears in the menu instead):

  • Duration: Shade by span duration so longer spans stand out
  • Service: Group by service identity
  • Service + Operation: Distinguish operations within the same service
  • Span type: Separate client, server, producer, consumer, internal spans
  • Host: Identify host-level distribution
  • Container: Group by container identity

In the Dependencies view, Color by is only available in Span view. Open legend is available in both Service view and Span view — the Service view always colors by service and shows the legend accordingly; Span view shows the legend for the dimension selected in Color by.

Use it to

  • Visually cluster related work and spot outliers faster.
  • Understand what "hot" or "unhealthy" spans represent at a glance.

Zoom and pan​

All trace views support zooming and scrolling when content exceeds the viewport.

Use it to

  • Navigate from the full request (macro) to a suspicious region (micro).
  • Inspect dense traces without losing your place.

Minimap (dependencies only)​

A thumbnail of the full dependency graph pinned to the bottom-right corner. Use it to stay oriented in large graphs — the minimap shows the overall layout while the main viewport focuses on the zoomed region.

Use it to

  • Pan the main viewport by dragging the selection window.
  • Jump to a different region of the graph by clicking anywhere on the minimap.

Expand view​

Expand the drilldown visualization area to use the full screen.

Use it to

  • Reduce clutter and increase visibility for dense graphs.
  • Make complex traces easier to read and navigate.

Aggregation (dependencies only)​

From the menu, select Aggregation to choose how the Dependencies view summarizes node and edge values. The same options are available in both Service view and Span view:

  • Avg Duration (default): typical latency
  • Sum Duration: total time spent on the connection
  • Min Duration: best-case latency
  • Max Duration: worst-case latency
  • Request count: number of requests on the connection
  • Error count: number of errors on the connection

The selected aggregation drives the metric shown on nodes and the value shown on edges.

Group by (dependencies only)​

Available in Span view only. From the menu, select Group by to reorganize the graph around a chosen field. Spans that share the same value are grouped into a single node, which makes repeated calls, heavy fan-out, and per-dimension hotspots easy to spot.

Supported fields include:

  • operationName
  • serviceName
  • tags.cx.application.name
  • tags.cx.event.id
  • tags.cx.subsystem.name
  • tags.http.method
  • tags.http.status_code
  • tags.http.url
  • Other span tags present on the trace

Pair Group by with an Aggregation to answer different questions: max for the worst offender, avg for consistent slowness, sum for cumulative repeated cost.

Zoom to selected span (flame only)​

Zoom the flame graph to center on and fill the viewport with the currently selected span. Select the zoom button in the action bar after selecting a span.

Zoom to span

Use it to

  • Instantly focus on a span of interest without manual panning and zooming.
  • Examine a small or deeply nested span at full width.

Change trace layout (flame only)​

Rotate the flame chart orientation (top-down or upside-down). Select the Trace layout dropdown in the action bar, then choose Flame or Icicle to match your preferred reading direction. On smaller screens, Trace layout appears in the menu instead.

Use it to

  • Focus on the part of the trace you’re investigating (a specific service path or span chain).
  • Make large traces easier to understand by emphasizing a relevant route.

Depth (Gantt only)​

Control how much of the hierarchy is expanded/collapsed. Select the Depth dropdown in the action bar. On smaller screens, Depth appears in the menu instead.

Use it to

  • Collapse noise and focus on top-level structure.
  • Expand only as deep as needed to validate a suspected path.

Manage columns (Gantt only)​

Customize which columns appear alongside the timeline table.

Use it to

  • Bring critical context (service, operation, status, tags) into view while investigating timing.
  • Add the fields you rely on most during troubleshooting.

How investigations flow across views​

A common workflow that gets to root cause quickly:

  1. Start in Dependencies (Service view) to understand which parts of the architecture were involved.
  2. Switch to Flame to find the biggest contributors to latency and identify likely bottlenecks.
  3. Open Gantt to confirm the true timeline (ordering, overlap, gaps, and concurrency).
  4. Drill into the selected span/service details to validate errors, attributes, events, and correlated logs.

Since the view state is preserved while switching, you can iterate without losing your place.

Lambda spans​

AWS Lambda spans render with a dual-icon badge across every drilldown view—Dependencies (Service view and Span view), Gantt, and Flame. The badge pairs the Lambda symbol (λ) with the runtime language reported on the span, so you can identify both the platform and the runtime at a glance without opening the span details.

Lambda spans

A span is treated as Lambda when any of these OpenTelemetry attributes is present on the span or its process tags:

  • cloud.platform=aws_lambda
  • rpc.service=Lambda
  • any faas.* attribute (for example, faas.name, faas.invocation_id)

The runtime icon comes from telemetry.sdk.language and supports Python, .NET, JavaScript, Go, and Java. Spans reporting .net resolve to the .NET icon. Lambda spans that don't expose a runtime language—and all non-Lambda spans—keep the existing single icon.

Dependencies view​

Use Dependencies to understand how the request flows through your system — either at the service level (architecture and handoffs) or at the span level (exact operations and call trajectory).

This view is especially useful when you want to answer:

  • "Which service called what, and in what order?"
  • "Where does the request fan out or bottleneck?"
  • "Which dependency is failing or adding latency?"
  • "Is this a single bad operation or a broader service-to-service issue?"
ViewLevelNodes and edgesPrimary use
Service viewService-levelNodes = services, edges = requests between servicesSystem-wide architecture and bottlenecks
Span viewSpan-levelNodes = spans, edges = requests between parent-childDeep dive trace execution and errors

Dependencies-specific controls​

In addition to the shared Action bar controls, the Dependencies view provides:

  • Service view / Span view toggle: Switch between a service-to-service map and a span-level graph. Group by is only available in Span view.
  • Group by ( menu, Span view only): Group spans by operation, service, or a span tag such as tags.http.method.
  • Aggregation ( menu): Summarize node and edge values.
  • Node detail ( menu): Define the level of detail displayed for nodes in the graph. Choose between:
    • Compact: Use when you have a large or complex trace and want a cleaner view. Each node shows minimal information — operation and span type for spans, service name and type for services. Hover any node to see full details on demand. For service nodes with more than 10 operations, the hover tooltip shows the top 10 operations ranked by request count; switch Node detail to Standard to see every operation on hover.
    • Standard (default): Use when you want full context directly on each node without hovering — duration and percentage of trace for spans, RED metrics and operations data for services. When Group by is active, grouped operation breakdown is also shown. Service nodes are scrollable, so hovering surfaces every operation regardless of count.

Dependencies controls

Graph actions​

The Dependencies canvas has an on-graph toolbar with these actions:

  • Zoom in / Zoom out: Adjust the zoom level of the graph.
  • Reset view: Return the graph to its default fit and center.
  • Switch to vertical layout / Switch to horizontal layout: Toggle the layout direction of the graph.
  • Show/Hide edge labels: Show or hide the aggregation metric value on each edge.
  • Export as PNG: Download the current graph view as a PNG image.

Map actions

Minimap navigation

Drag the selection window in the minimap to pan the main viewport. Click anywhere on the minimap to jump there directly. The selection window always reflects the area currently in view.

Map interactions​

Node interactions

  • Single click: Selects the node. The Info panel on the right updates with the node's details and related data.
  • Hover: Shows a tooltip with key context (service name, operation, duration, error status).

Edge interactions

Hover an edge to see a tooltip with:

  • Service view: source → destination service names, direction label (Incoming or Outgoing), Requests count, Errors % (count), and the aggregation metric (for example, Avg. duration).
  • Span view: source → destination operation names, direction label (Incoming or Outgoing), duration, status code, and connection types. For grouped edges, the duration reflects the selected Aggregation across all spans in the group; for single-span edges, it shows that span's individual duration.

Node and edge states

Nodes and edges use visual states to flag attention:

  • Error: Error spans render with a red color on the node. Red edges indicate errors on service exit spans.
  • Uninstrumented service (Service view only): A service with no OpenTelemetry instrumentation — it emits no spans, logs, or metrics to Coralogix. It appears on the dependency map only because other instrumented services reference it in their spans, revealing its existence in the call path. Uninstrumented services render with a dashed border so architectural blind spots are visible rather than silently missing from the investigation. Without instrumentation, its internal behavior, latency, and errors can't be observed directly — add OpenTelemetry instrumentation to the service to gain full visibility.
  • Request loops (cyclic dependencies): When a request flows back through a service or span that already called it — for example, Service A → Service B → Service A — the back-pointing edge renders as a dashed line in both Service view and Span view. The dashed edge appears automatically whenever the trace contains a cycle; no toggle or setting controls it. Use it to spot request loops that signal architectural issues and complicate troubleshooting.

Quick actions on a node​

Each node displays a 3-dots icon that opens a quick actions menu. Use it to pivot to another view while keeping the same span or service selection and timeframe, or to jump to related investigations.

  • View in Gantt: Opens a new tab showing the selected span or service and its timeframe in Gantt. Use when you need to inspect the exact timing and sequence of events.
  • View in Flame: Opens a new tab showing the selected span or service and its timeframe in Flame. Use when you want to quickly identify the biggest contributors to latency.
  • Open in new tab: Opens the selected span or service in a new tab in the current view.
  • Show Surrounding Spans: Opens a new tab scoped to the selected node with the surrounding spans loaded for a chosen window — 5 minutes, 15 minutes, 30 minutes, 1 hour, or 3 hours. Use it when the trace exceeds the time range or 20,000-span limit and you need to inspect spans next to the selected one, or when you want to investigate what was happening around a specific span without the full trace context.
  • View Highlights: Opens Highlights filtered by service, operation, and duration range. When the selected node contains an error, Highlights opens pre-filtered to error spans. Use when you want to understand what fields and values are driving latency or errors for a specific service or operation.
  • View APM Errors: Opens APM with the API Errors graph filtered by the selected service and time range. Available only when the selected node contains an error.

In Service view, additional actions are available depending on the service type:

  • View Service Overview: Opens a new tab to the APM Service Catalog overview tab filtered by the service and time range. Use for a broader picture of the service's health beyond the current trace.
  • View APM Service Operation: Opens APM filtered by the selected service and operation. Use when you want to compare this operation's performance across all traces, not just the current one.
  • View APM Database: Opens APM filtered by the database service, database name, operation, and trace duration. Available only for database service nodes. Use when investigating slow or failing database calls.
  • View APM Database Operation: Opens APM filtered by the database operation. Available only for database service nodes.
  • View APM Serverless: Opens APM Serverless for the selected service. Available only for serverless services. Use to investigate cold starts, invocation errors, or duration anomalies for the selected function.

Node actions

The base actions (View in Gantt, View in Flame, Open in new tab, Show Surrounding Spans, View Highlights, View APM Errors) are available in both Service view and Span view. The additional actions in this list appear only in Service view.

Service view​

Service view summarizes the trace as a service-to-service map.

Service view

Use it to

  • Validate the route of the request across microservices.
  • Spot unexpected fan-out, extra hops, or indirect routing.
  • Identify the dependency edge that looks slow or failing and drill into it.

Service view node layout

Each service node displays the service name, the service type, and three top-line metrics:

  • Requests: percentage of the trace's total requests, with the span count in parentheses (for example, 41% (12)).
  • Errors: percentage of requests that errored, with the count in parentheses.
  • Avg. duration: the duration summary based on the selected Aggregation (Avg by default; the metric label changes to Max, Min, or Sum accordingly).

Hovering over a service node expands it in place to show a per-operation breakdown. Each row lists:

  • A direction arrow: → for outgoing calls from this service, ← for incoming calls to this service.
  • The operation name and its protocol (for example, hipstershop.ProductCatalogServ... (gRPC), or /product/{id} (HTTP)).
  • Per-operation metrics in three columns:
    • Requests (spans): share of total spans in the service, shown as count and percentage (for example, 5 (10%) of total service spans).
    • Errors: error rate for operations to or from this service, shown as percentage and absolute count out of total operations (for example, 60% (3) for 3 errors out of 5 operations).
    • Aggregation column: labeled MAX, MIN, AVG, SUM, REQUEST COUNT, or ERROR COUNT depending on the selected Aggregation. Shows the matching value for the operation (for example, MAX is the longest span duration observed for that operation).

Scroll inside the expanded node to browse additional operations.

DB and Lambda nodes

Service nodes for DB and Lambda service types show a layout tailored to each type — operationDetail is hidden, and DB- or Lambda-specific fields surface in its place. The top-line metrics (Requests, Errors, Aggregation) remain the same.

Drilldown actions

  • Select a service node to open the Info panel and drill into its underlying spans (incoming, outgoing, internal).
  • From the Info panel, select a span to investigate errors, attributes, events, and correlated logs.

Edge metrics

The selected Aggregation determines what edges display:

AggregationWhat it answers
Avg Duration (default)Typical latency between services
Max DurationWorst-case latency
Min DurationBest-case latency
Sum DurationTotal time spent on the connection
Request countNumber of requests on the connection
Error countNumber of errors on the connection

Span view​

Span view shows the trace as a sequence of spans so you can follow the exact operations underlying the service interactions.

Span view

Use it to

  • Pinpoint the specific operation responsible for a bottleneck or error.
  • Understand how the trace branches and converges.
  • Validate the downstream chain under a particular operation.

Span view node layout

Each span node displays:

  • The operation name and service icon, with the protocol label below (for example, hipstershop.RecommendationService/L... / gRPC).
  • Span type: HTTP, DB, Messaging, Cache, Internal, Serverless, or Gen-AI.
  • A single duration metric driven by the selected Aggregation (for example, 5.9 ms Duration).
  • Error status code and a red error icon, when the span has errors.
  • The full operation or method identifier (for example, grpc ListRecommendations).
  • Common tags for the span type — Coralogix surfaces the most important tags for each span type (for example, HTTP method and status code for HTTP spans, DB system and statement for DB spans, messaging system and destination for Messaging spans).

Long operation names are truncated with …; hover the node to see the full name.

When Group by is active

The node layout changes to reflect the grouping:

  • Each node displays the Group by key and value.
  • Within each group, spans are further grouped by operation name, using the same Requests, Errors, and Aggregation columns as the Service view layout.

Drilldown actions

  • Select a span node to open the Info panel and view span details.
  • Hover to preview key context (service + operation + timing).
  • Use Group by + Aggregation to reorganize the view around what matters (max for the worst offender, avg for consistent slowness, sum for cumulative repeated cost).

Flame view​

Use Flame when you want to answer: “Where did the time go?”

Flame view

Flame visualizes spans as a flame graph so you can quickly identify:

  • The biggest contributors to latency.
  • Slow operations hidden inside deep call stacks.
  • Services or operations dominating end-to-end time.

Flame is not a strictly time-based layout like Gantt. It’s designed to highlight dominant contributors and the structure of execution.

Visualization (how to read it)​

  • Width = duration of the span.
  • X-axis = execution time position. X-axis does not represent time. Spans are arranged horizontally to highlight hierarchy and latency contribution, while Gantt should be used to analyze the exact timing and ordering of operations.
  • Y-axis = hierarchy:
    • Height reflects nesting level (parent/child spans).
    • Helps distinguish parent waiting time vs child execution time, and makes blocking vs async work easier to interpret.
Visual elementWhat it shows
X-axisRelative position within the trace
Y-axisParent → child hierarchy
WidthSpan duration (end - start)
ColorSelected category (service / type / status)

Tooltip (what you learn on hover)​

Hover a span to see key investigation context, such as:

  • Service name + type
  • Operation name, application, subsystem
  • Duration and % of total trace
  • Error details (status + message), when present

Small spans indication​

In traces with many short-duration spans, individual spans can become too narrow to see or interact with in the flame graph. To ensure these spans remain visible and actionable, the Flame view groups consecutive small sibling spans into a single block with a count label (for example, “530 merged spans”). Even though they are small, these spans can still contribute to latency — this feature ensures you don’t miss them.

Small spans

  • Visual marker: Small sibling spans are merged into a single block that displays the span count. The block is styled distinctly from regular spans so it stands out. Merging is recalculated dynamically as you zoom — zooming in can reveal previously merged spans as individual blocks.
  • Hover: Hover the block to see the total count (for example, "530 merged spans").
  • Expand: Select the block to open a context menu listing each individual span. Each entry shows a color dot matching the flame graph coloring, a service icon (when available), the operation name, service name, and duration.
  • Filter: Use the search field at the top of the menu to filter spans by operation name or service name.
  • Select: Select a span from the list to open its details. The currently selected span is highlighted in the list.
  • Zoom: Select the zoom icon next to a span to zoom the flame graph directly to that span, making it and its surrounding context fully visible.

Drilldown actions​

  • Select a span to focus your investigation and open span details in the side panel.
  • Use search + highlight to locate repeated patterns (for example: repeated DB call, specific endpoint, particular host).
  • Use color + legend to cluster related work (for example: by service or duration bands).

Quick actions (right-click)​

Right-click any span to open the quick actions menu. A tooltip on each span indicates that right-click opens the context menu. Quick actions appear on individual spans only — they are not available on merged span blocks.

  • View in Gantt: Opens a new tab showing the selected span and its timeframe in Gantt. Use when you need to inspect the exact timing and sequence of events.
  • View in Dependencies: Opens a new tab showing the selected span and its timeframe in Dependencies (Service view). Use when you want to see how the request flows across services and operations.
  • Open in new tab: Opens the selected span in a new tab in the current view.
  • View Highlights: Opens Highlights filtered by service, operation, and duration range. When the selected span contains an error, Highlights opens pre-filtered to error spans. Use when you want to understand what fields and values are driving latency or errors for a specific service or operation.
  • View APM Errors: Opens APM with the API Errors graph filtered by the selected service and time range. Available only when the selected span contains an error.

Gantt view​

Use Gantt when you want to answer: “What happened in this trace timeline?”

Gantt view

Gantt represents spans as a true timeline chart so you can understand:

  • Exact ordering of operations
  • Overlap and concurrency (what ran in parallel vs. sequentially)
  • Gaps, waiting time, and blocking behavior

Visualization (how to read it)​

  • X-axis = time progression, starting at 0 (trace start) through total trace duration.
  • Each row = a span.
  • Bar position shows when a span started relative to the trace start.
  • Bar length shows the span’s duration.

Tooltip (what you learn on hover)​

Hover a bar to get quick context such as:

  • Service name + type
  • Operation name, application, subsystem
  • Duration and % of total trace
  • Error details (status + message), when present
  • Relevant events (when available)

Events​

When drilling into a specific trace or span, Gantt view displays events directly on the timeline. Quickly understand what happened at each point in the execution flow without leaving the trace.

Events in Gantt

Gantt view surfaces events from:

  • HTTP requests

  • gRPC calls

  • Database operations

  • Span-level events

Events are displayed directly within the relevant spans on the timeline, with each event appearing at its exact timestamp.

Hovering over any event instantly reveals all relevant details, speeding up investigations and reducing MTTR. For example, for an HTTP request you’ll see service, operation, http.method, http.status_code, and http.url. Easily copy values such as URLs or queries for further analysis.

Gantt view also surfaces logs that belong to the trace as diamond-shaped marks on the relevant span lines. Use them to scan log activity along the timeline without leaving the trace.

Trace-related logs as diamond marks on Gantt span lines

How they appear:

  • Each diamond inherits the owning span's service color, so the log identifies its service at a glance.
  • A diamond sits at the log's timestamp within the span's time window.
  • When a diamond and an event circle overlap on the same pixel, the diamond renders on top so both indicators stay visible.

Hover a diamond to see the log's timestamp (in your chosen Gantt time zone), the full log body as formatted JSON, and a copy icon for the log fields. If several logs share a pixel position, the marks group into one diamond — the tooltip shows the latest log plus a +N more logs chip counting the rest.

Only logs that already carry the trace's span ID appear as marks. Orphan logs and logs surfaced in other drilldown tabs don't appear here.

Drilldown actions​

  • Select a span to open span details in the side panel and validate the full context (errors, attributes, events, correlated logs).
  • Follow the downstream path to understand what the selected span triggered next.
  • Use highlight and navigation to walk through errors or search matches in time order.

Quick actions (right-click)​

Right-click any span to open the quick actions menu. A tooltip on each span indicates that right-click opens the context menu.

  • View in Flame: Opens a new tab showing the selected span and its timeframe in Flame. Use when you want to quickly identify the biggest contributors to latency.
  • View in Dependencies: Opens a new tab showing the selected span and its timeframe in Dependencies (Service view). Use when you want to see how the request flows across services and operations.
  • Open in new tab: Opens the selected span in a new tab in the current view.
  • Show Surrounding Spans: Opens a new tab scoped to the selected span with the surrounding spans loaded. Useful when the trace exceeds the time range or 20,000-span limit and you need to inspect spans next to the selected one, or when you want to investigate what was happening around a specific span without the full trace context.
  • View Highlights: Opens Highlights filtered by service, operation, and duration range. When the selected span contains an error, Highlights opens pre-filtered to error spans. Use when you want to understand what fields and values are driving latency or errors for a specific service or operation.
  • View APM Errors: Opens APM with the API Errors graph filtered by the selected service and time range. Available only when the selected span contains an error.

Next steps​

Inspect span metadata, errors, and performance context in Span fields and attributes.

Last updated on